ASHE, ASCE ME, ASCE T&DI, and ASCE DVGI - Indian River Inlet Bulkhead (1 PDH)
If you are a member, please
log in to access additional, potentially lower registration fee options.
Category
Affiliate Group Training
Registration Info
Registration is required
Payment In Full In Advance Only
About this event

March 26, 2025 - Virtual Tech Session
12pm - 1pm - 1 PDH
"Indian River Inlet North Bulkhead Repairs Slope Stability Analysis"
with
Dante Nocito
Agate Construction Company, Inc.
and
John J. Peirce, Jr., P.E., BC.GE
Peirce Engineering, Inc
|
|
Repair of the existing, submerged 130 feet high, 1.2-1.6 H:1 V slope, required slope armoring with a 5.6 feet thick layer of riprap, 5-ton capstones, and the installation of two sheet pile walls within 20 feet of the top of the slope. Construction documents from the US Army Corps of Engineers specified the following maximum construction surcharges:0 PSF@ 0 to 50 feet from top of slope, 250 PSF @ 50 to 75 feet, and 500 PSF beyond 75 feet. Because installation of the heavy rip rap, capstones and sheet piling required a 300 ton crawler crane and other heavy equipment, the contractor requested that the engineer perform a series of analyses to demonstrate slope stability under multiple equipment surcharge loads. Following the Corps' review of these analyses, the contractor was granted approval to place equipment surcharge loads with within all three load restriction areas.
|
|
|
|
|
|
|