|
ASCE and ASHE Joint Meeting - Save the Date
SR 422 Sections M01, M02 and M03, US 422/Pottstown Bypass Reconstruction Project (1 PDH)
The Pottstown Bypass corridor project involves improvements to nearly seven miles of SR 422 between the Berks County line and the Sanatoga Interchange in Chester and Montgomery Counties.This 4-lane section of expressway was originally constructed in the late 1960’s and includes seven interchanges and two major crossings over the Schuylkill River.Minor mainline alignment revisions are planned to meet current design standards, but the “S-curve” alignment at the western limit of the project did require a significant shift in horizontal alignment to flatten the reverse curves and improve the roadway geometry.Additionally, two interchanges were reconfigured, four interchanges will be reconstructed, and one interchange included improvements to ramp termini.The project has been divided into three design sections and will be let and built in seven construction sections.The presentation team will provide an update on the overall program.
Speakers:
Sal Ali, Principal Assistant Construction Engineer, PennDOT District 6
Dilip Radadia, PE, Project Manager, Jacobs
Tom Cornell, PE, Highway Group Manager/Project Engineer, Jacobs
Chris Naab, PE, Structural Project Engineer, Jacobs
Date/Time:
January 21, 2026
6:00 PM - Cocktails
6:45 PM - Dinner
7:30 PM - Meeting Presentation
Location:
Crowne Plaza Hotel
260 Mall Boulevard
King of Prussia, PA 19406
Cost:
$80 General
$25 Students/Government
Registration link coming shortly!
|